Panels

Panels are transported to the site on A or U frame trailers. When the panel is installed in proper position, it is supported with temporary jacks or other sufficient support. Each panel is then carefully leveled and aligned using shims. In some cases panels are fixed mechanically by bolts.

The temporary support will be released only when it is assured that the permanent support is secured. Connection gaps are grouted normally using a non-shrink mix.